Latest News
It’s all smiles at McCain plant thanks to Deritend H&K - 04 December 2009
A brand new washing and de-stoning plant has been installed at McCain’s potato specialities production plant at Wombourne, in the West Midlands. The plant’s entire peeling and processing line has also been updated, and reinstalled in a more flexible and efficient layout - all with expert help from Deritend H&K. read more ...

Flagship West Midlands engineering centre increases capacity - 07 October 2009
Leading industrial maintenance, service and repair group, Deritend Industries, is increasing the levels of skilled staff and engineering repair work carried out at Deritend RMB, the company’s state-of-the-art engineering works in West Bromwich.  read more ...

Deritend Moves Gearbox Production - 20 May 2009
Deritend is intending to move all its West Midlands based gearbox production, repair and fabrication work to its new state-of-the art engineering workshop based at Brandon Way. read more ...

Deritend Takes Action To Protect UK Jobs… - 10 March 2009

UK national industrial maintenance and support group Deritend Industries is taking positive action to protect skilled jobs in the face of a possible continued downturn. read more ...


Deritend goes large… - 25 November 2008
Deritend has significantly increased it’s capacity to build, fabricate and repair large machines with the opening of its new Brandon Way facility read more ...

DERITEND RMB’S GEARBOX EXPERTISE - 19 November 2008
A UK aggregate producer has recently installed a new in-feed conveyor to deliver stone to a large conveyor at a roadstone quarry in the Pennines. read more ...

EUREKA! - 17 October 2008
Severn Trent Water plans to pump 8,000 litres a second with new Archimedes pump system supplied by Deritend  read more ...

NEW GENERAL SALES MANAGER FOR DERITEND & DERITEND RMB - 10 October 2008
Deritend Industries has announced a key appointment; Stuart Hutchinson has accepted the position of General Sales Manager of the Deritend / Deritend RMB & Deritend H&K business units... read more ...

DERITEND POWERS AHEAD WITH ACQUISITION OF H&K - 30 September 2008
Deritend Industries, the national industrial maintenance group, has acquired H&K Industrial Services (H&K) strengthening the company’s position... read more ...

SHEFFIELD BASED PRE-FORMED WINDINGS EXPANDS PRODUCTION FACILITIES BY 30% - 11 September 2008
Pre-Formed Windings of Sheffield, which has recently completed a 30% expansion of the production facilities at its Hackenthorpe site, creating new job oppurtunities... read more ...

DERITEND ACQUIRES GEARBOX SPECIALIST RMB ENGINEERING - 18 September 2007
Since an MBO in March 2001 the intention of The Deritend Group board has been to grow the business  read more ...

UNIQUE ASSET MANAGEMENT SYSTEM IMPROVES PROFITABILITY - 22 August 2007
Deritend has developed
a unique online Portal & Asset database to enable companies with large quantities
of rotating machines
 read more ...

DERIT30
Download Press Release
Download Hi-res Image

 DERITEND PULLS OUT THE STOPS FOR THE UNIVERSITY OF SHEFFIELD, PROVIDING  HIGH PRECISION COILS FOR PRESTIGIOUS MICE EXPERIMENT.
 
Special miniature precision solenoid coils offer positioning accuracies of ~ 0.0508mm in experiment to understand matter-antimatter symmetry in the universe.

Deritend’s Pre-formed Windings division has made a major contribution to the University of Sheffield’s participation in the Muon Ionisation Cooling Experiment (MICE), which is designed to understand matter-antimatter symmetry in the universe. Deritend pulled out all of the stops to design and manufacture 30 miniature precision solenoid coils at short notice for the prototype unit, and has since manufactured 90 coils for the full size version. The coils offer positioning accuracies of ~ 0.0508mm and can operate in high radiation and vacuum environments.

“The University of Sheffield had done a bit of a trawl of coil manufacturers before they found us,” said Vernon Fletcher, General Manager of Deritend’s Pre-Formed Windings Centre based in Sheffield. The actual coils were manufactured at Deritend’s Grimsby Engineering Works, Kevin Parrott, General Manager at Grimsby, adds: “The major problem they had was tolerances: these were so exacting that other manufacturers didn’t want to commit themselves. However, with our track record of manufacturing special coils – up to 12 tonnes in some cases - we saw the project as a challenge, not only because of the tolerances, but also because we had so little time for manufacture. In the end we managed to achieve both objectives, enabling the project to be commenced on time.”
 
The MICE experiment is an essential step in accelerating R&D towards the realisation of a neutrino factory, in which an intense neutrino beam is obtained from the decay of muons in a storage ring. Neutrino factories are the ultimate tools for precision studies of neutrino oscillations and of leptonic charge-parity (CP) violation, a measurement that might prove decisive in understanding the matter-antimatter asymmetry of the universe.

Sheffield's contribution to the MICE experiment is the design and construction of a target to produce the required muons from the ISIS beam, the world’s most powerful source of pulsed neutrons and muons, which is located at the Rutherford Appleton Laboratory in Didcot near Oxford.         
                                             
Since the normal uses of the ISIS beam will continue in parallel to the MICE experiment, the target mechanism must cause as little disruption to the ISIS beam as possible: It needs to dip into the beam halo by around 5mm for 2ms (or less) before it is extracted.

The target is dipped in and out of the ISIS beam using a linear drive. This consists of a shuttle made of magnetic material, which sits inside the series of coils manufactured by Pre-Formed Windings. When a current is passed through these coils they induce a force on the shuttle, the direction of which depends on the direction of the current in the wires. In this way it is possible to move the shuttle, and its attached target, backwards and forwards inside the coil assembly, dipping it into and out of the beam.

For more information regarding mice see:

About Deritend’s Pre-Formed Windings Division
Pre-formed Windings, founded in 1968, is part of The Deritend Group Ltd. Based in Sheffield, UK. Pre-formed Windings produces a variety of types of coils for end users, repairers and OEM’s around the world. The Coils are for various AC and DC applications including High Voltage Motors and Generators and Traction Motors. The division offers extensive capabilities, such as the ability to respond at very short notice, specialised coil design, 24-hour manufacturing, technical support and experience of export logistics.
…………. Ends……………
For further information contact: Helen Holman, Marketing Manager, Deritend Group Ltd, Cyprus Street Off Upper Villiers Street, Wolverhampton, West Midlands WV2 4PB Tel: 01902 – 392315  E-mail:
hholman@deritend.co.uk WEB: www.deritend.co.uk
 

[ Return To List]